BACKGROUND
As a community men’s group they wanted to engage a local company. As it is a council building there was additional requirement to provide proof of all licences and insurances. Solar Panel Installation was done over 2 days, with impending rain and no interruption to the group’s activities.
Site specifics
| No. of panels: | 52 x LG NeON2 360W (LG360N1C-N5) |
| System size: | 18.72kW |
| Inverter: | 28 x SolarEdge P730DC optimisers &1 x SolarEdge SE15K 3 phase 15kW inverter |
| Extras: | 3 phase SolarEdge Modbus Meter with 3 x CT clamps, for consumption monitoring, all black rail including mid clamps, end clamps & end caps. |
| 3 phase power: | Yes |
Predicted Return on Investment & savings
| Predicted Carbon Avoided: | 26,100kg CO2 per year |
| Trees planted over system lifetime: | 31,071 |
| Estimated annual power generation: | 24,404kWh’s per year |
| Estimated annual savings: | $4,629 a year, $115,725 lifetime |
| Installation date: | December 2020 |
| System payback period: | 4 years & 11 months |
Customer Feedback
“ With good references from two other nearby installations inspected by Knox & District Woodworkers Club, and the professional commercial approach to detail and follow up provided, we awarded the contract to Total Solar Solutions Australia.
Thanks to Reece, Matt, Jack, Mitch and Naomi for their top workmanship! “