{"id":4938,"date":"2021-07-22T23:05:20","date_gmt":"2021-07-22T23:05:20","guid":{"rendered":"http:\/\/www.totalsolarsolutions.com.au\/blog\/?p=4938"},"modified":"2024-08-08T03:07:45","modified_gmt":"2024-08-08T03:07:45","slug":"turn-the-corner","status":"publish","type":"post","link":"https:\/\/www.totalsolarsolutions.com.au\/blog\/case-studies\/turn-the-corner\/","title":{"rendered":"Turn the Corner"},"content":{"rendered":"\n<p class=\"case-study-subtitle\">BACKGROUND<\/p>\n\n\n\n<p>Commercial premise \u2013 the business needed to remain open and operating while the <a href=\"https:\/\/www.totalsolarsolutions.com.au\/\">solar panels system<\/a> was being installed. We were required to attend and schedule the power shut down outside of business hours, so their clients were not adversely affected by the installation.<\/p>\n\n\n\n<figure class=\"wp-block-table case-study-table\"><table><tbody><tr><td><strong>No. of panels:<\/strong><\/td><td>63 x LG NeON2 BLACK 355W (LG355N1C-N5)<\/td><\/tr><tr><td><strong>System size:<\/strong><\/td><td>22.36kW<\/td><\/tr><tr><td><strong>Inverter:<\/strong><\/td><td>63 x Enphase IQ7A microinverters with 1 Enphase Envoy S-metered<\/td><\/tr><tr><td><strong>Extras:<\/strong><\/td><td>Dedicated Enphase switchboard, Longline Kliplok Mounts, 10-15 degree tilt frame<\/td><\/tr><tr><td><strong>3 phase power:<\/strong><\/td><td>Yes<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<p class=\"case-study-subtitle\">Predicted Return on Investment &amp; savings<\/p>\n\n\n\n<figure class=\"wp-block-table case-study-table\"><table><tbody><tr><td><strong>Predicted Carbon Avoided:<\/strong><\/td><td>33,700kg CO2 per year<\/td><\/tr><tr><td><strong>Trees planted over system lifetime:<\/strong><\/td><td>40,119<\/td><\/tr><tr><td><strong>Estimated annual power generation:<\/strong><\/td><td>31,537kW hrs per year<\/td><\/tr><tr><td><strong>Estimated annual savings:<\/strong><\/td><td>$5,372 a year, $134,300 lifetime<\/td><\/tr><tr><td><strong>Installation date:<\/strong><\/td><td>May 2021<\/td><\/tr><tr><td><strong>System payback period:<\/strong><\/td><td>6 years &amp; 10 months<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p class=\"case-study-subtitle\">Customer Feedback<\/p>\n\n\n\n<p>Total Solar Solutions Australia installed 63 <a href=\"https:\/\/www.totalsolarsolutions.com.au\/commercial-solar\">commercial solar panels<\/a> on the roof of our medical clinic recently. Going forward, we hope that our panels will generate enough power to meet the clinic\u2019s needs in Spring and Autumn. In Winter, we\u2019ll still have to purchase some electricity from the grid\u2026 but in Summer, we expect to be exporting power. Over time, the solar panels will pay for themselves, but more importantly, we know that from today we\u2019ve played a small part in helping ensure a brighter future for our children.<\/p>\n\n\n\n<p>Very professional to deal with &#8211; from the initial survey, through subsequent communications, to installation, and post-install support. <\/p>\n\n\n\n<h4>\u201c I would energetically recommend them. \u201c<\/h4>\n\n\n\n<p><br><\/p>\n\n\n\n<p><img loading=\"lazy\" src=\"http:\/\/www.totalsolarsolutions.com.au\/blog\/wp-content\/uploads\/2021\/07\/img_casestudies_Turnthecorner_2.jpg\" alt=\"\" width=\"970\" height=\"647\" class=\"alignnone size-full wp-image-4940\" srcset=\"https:\/\/www.totalsolarsolutions.com.au\/blog\/wp-content\/uploads\/2021\/07\/img_casestudies_Turnthecorner_2.jpg 970w, https:\/\/www.totalsolarsolutions.com.au\/blog\/wp-content\/uploads\/2021\/07\/img_casestudies_Turnthecorner_2-300x200.jpg 300w, https:\/\/www.totalsolarsolutions.com.au\/blog\/wp-content\/uploads\/2021\/07\/img_casestudies_Turnthecorner_2-768x512.jpg 768w\" sizes=\"(max-width: 970px) 100vw, 970px\" \/><br><br>\n\n<img loading=\"lazy\" src=\"http:\/\/www.totalsolarsolutions.com.au\/blog\/wp-content\/uploads\/2021\/07\/img_casestudies_Turnthecorner_3.jpg\" alt=\"\" width=\"970\" height=\"647\" class=\"alignnone size-full wp-image-4941\" srcset=\"https:\/\/www.totalsolarsolutions.com.au\/blog\/wp-content\/uploads\/2021\/07\/img_casestudies_Turnthecorner_3.jpg 970w, https:\/\/www.totalsolarsolutions.com.au\/blog\/wp-content\/uploads\/2021\/07\/img_casestudies_Turnthecorner_3-300x200.jpg 300w, https:\/\/www.totalsolarsolutions.com.au\/blog\/wp-content\/uploads\/2021\/07\/img_casestudies_Turnthecorner_3-768x512.jpg 768w\" sizes=\"(max-width: 970px) 100vw, 970px\" \/><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Commercial premise \u2013 the business needed to remain open and operating while the solar system was being installed. <\/p>\n","protected":false},"author":1,"featured_media":4939,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[18],"tags":[19],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v15.2.1 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Turn the Corner - Total Solar<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"http:\/\/www.totalsolarsolutions.com.au\/blog\/case-studies\/turn-the-corner\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Turn the Corner - Total Solar\" \/>\n<meta property=\"og:description\" content=\"Commercial premise \u2013 the business needed to remain open and operating while the solar system was being installed.\" \/>\n<meta property=\"og:url\" content=\"http:\/\/www.totalsolarsolutions.com.au\/blog\/case-studies\/turn-the-corner\/\" \/>\n<meta property=\"og:site_name\" content=\"Total Solar\" \/>\n<meta property=\"article:published_time\" content=\"2021-07-22T23:05:20+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2024-08-08T03:07:45+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.totalsolarsolutions.com.au\/blog\/wp-content\/uploads\/2021\/07\/img_casestudies_Turnthecorner_1.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1192\" \/>\n\t<meta property=\"og:image:height\" content=\"796\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\">\n\t<meta name=\"twitter:data1\" content=\"netable\">\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\">\n\t<meta name=\"twitter:data2\" content=\"1 minute\">\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebSite\",\"@id\":\"http:\/\/www.totalsolarsolutions.com.au\/blog\/#website\",\"url\":\"http:\/\/www.totalsolarsolutions.com.au\/blog\/\",\"name\":\"Total Solar\",\"description\":\"Total Solar Solutions Blogs\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":\"http:\/\/www.totalsolarsolutions.com.au\/blog\/?s={search_term_string}\",\"query-input\":\"required name=search_term_string\"}],\"inLanguage\":\"en-AU\"},{\"@type\":\"ImageObject\",\"@id\":\"http:\/\/www.totalsolarsolutions.com.au\/blog\/case-studies\/turn-the-corner\/#primaryimage\",\"inLanguage\":\"en-AU\",\"url\":\"https:\/\/www.totalsolarsolutions.com.au\/blog\/wp-content\/uploads\/2021\/07\/img_casestudies_Turnthecorner_1.jpg\",\"width\":1192,\"height\":796},{\"@type\":\"WebPage\",\"@id\":\"http:\/\/www.totalsolarsolutions.com.au\/blog\/case-studies\/turn-the-corner\/#webpage\",\"url\":\"http:\/\/www.totalsolarsolutions.com.au\/blog\/case-studies\/turn-the-corner\/\",\"name\":\"Turn the Corner - Total Solar\",\"isPartOf\":{\"@id\":\"http:\/\/www.totalsolarsolutions.com.au\/blog\/#website\"},\"primaryImageOfPage\":{\"@id\":\"http:\/\/www.totalsolarsolutions.com.au\/blog\/case-studies\/turn-the-corner\/#primaryimage\"},\"datePublished\":\"2021-07-22T23:05:20+00:00\",\"dateModified\":\"2024-08-08T03:07:45+00:00\",\"author\":{\"@id\":\"http:\/\/www.totalsolarsolutions.com.au\/blog\/#\/schema\/person\/5352b953695f7588882243c7b16cc5d3\"},\"inLanguage\":\"en-AU\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"http:\/\/www.totalsolarsolutions.com.au\/blog\/case-studies\/turn-the-corner\/\"]}]},{\"@type\":\"Person\",\"@id\":\"http:\/\/www.totalsolarsolutions.com.au\/blog\/#\/schema\/person\/5352b953695f7588882243c7b16cc5d3\",\"name\":\"netable\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"http:\/\/www.totalsolarsolutions.com.au\/blog\/#personlogo\",\"inLanguage\":\"en-AU\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/83c9c53d77a341078329d5f89a1e9a53?s=96&d=mm&r=g\",\"caption\":\"netable\"},\"sameAs\":[\"http:\/\/www.totalsolarsolutions.com.au\/blog\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","_links":{"self":[{"href":"https:\/\/www.totalsolarsolutions.com.au\/blog\/wp-json\/wp\/v2\/posts\/4938"}],"collection":[{"href":"https:\/\/www.totalsolarsolutions.com.au\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.totalsolarsolutions.com.au\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.totalsolarsolutions.com.au\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.totalsolarsolutions.com.au\/blog\/wp-json\/wp\/v2\/comments?post=4938"}],"version-history":[{"count":6,"href":"https:\/\/www.totalsolarsolutions.com.au\/blog\/wp-json\/wp\/v2\/posts\/4938\/revisions"}],"predecessor-version":[{"id":5274,"href":"https:\/\/www.totalsolarsolutions.com.au\/blog\/wp-json\/wp\/v2\/posts\/4938\/revisions\/5274"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.totalsolarsolutions.com.au\/blog\/wp-json\/wp\/v2\/media\/4939"}],"wp:attachment":[{"href":"https:\/\/www.totalsolarsolutions.com.au\/blog\/wp-json\/wp\/v2\/media?parent=4938"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.totalsolarsolutions.com.au\/blog\/wp-json\/wp\/v2\/categories?post=4938"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.totalsolarsolutions.com.au\/blog\/wp-json\/wp\/v2\/tags?post=4938"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}